1991

KUOYUH W.L. Enterprise Co., Ltd was established in Yunlin, Taiwan.

1992

Started mass production of F66 series overload protectors for shredders.

1997

“88”, “97”, and “98” series products have passed UL certification, improving product diversity and market visibility.

2002

Began to produce the “91” series products that applied in small household appliances and passed UL and TUV certification.

2003

Invested and established a factory in Guangdong, China: " KUOCHENG Electronic (SZ) Co., Ltd" and began to expand our business in the Chinese market. Also, obtained ISO9001 international quality management system certification.

2005

Became a qualified supplier of Dyson, provided small current, small size motor current protection devices.

2006

Introduced environmentally friendly materials in all raw materials to comply with ROHS regulations.

2008

Established the second factory in Guangdong: " KUOYUH (Dongguan) Enterprise Co., Ltd" with an area of 8000m2 and a monthly production capacity of 2 million overload protectors.

2010

Set up automation department and established UL product laboratory.

2012

The area of the Taiwan HQ was expanded to 6000m2, and obtained complete safety certification, including IEC, UL, CUL, CSA, TUV, VDE, CCC, SAA, CE, KC and other certificates.

2014

Overload protectors ("AR" 16 "Series) for DC equipment have been developed for trucks and ships.

2017

Added "102", "17", "18" series plug-in overload protectors to replace traditional automotive fuses.

2018

The area of Guangdong factory has been expanded to 1500m2, with a monthly production capacity of 4 million overload protectors.

2020

Added ATM/ATO/ATC blade fuse circuit breaker (replacing FUSE) for use on marine and trucks.

2021

Guangdong factory expanded by 2000m2, and added vehicle/Marine product line. Expand storage space.

2022

KUOYUH established the "Hydraulic electromagnetic Circuit Breakers" development team.

2023

KUOYUH develops a full range of Hi-amp circuit Breakers to enrich the automotive/Marine product line. And obtained UL certification.

2024

Taiwan headquarters, Taiwan factory expansion plan (new space: 4000m2). It is expected to be completed within 1 year.